Every step of a founder's journey deserves a record.Founders · AI · PolicyCHINAOPC / ENGLISH EDITION

Zhengzhou High-Tech Zone Compute Policy: Organizing Model Bills for Consultation

Whether computing power fees can enter the scope of support depends on the subject, service provider, actual settlement and specific rules. Based on the interpretation of the official policy of Zhengzhou High-tech Zone, this article analyzes how entrepreneurial teams organize model call bills, contracts and project uses, distinguish between expense occurrence and subsidy receipt, and remind them to check related relationships and similar support restrictions, and avoid using the page promotion quota to directly offset the project quotation.

Chinese edition published 23 Oct 2026 · 阅读中文原文 ↗

Source timingData date: 2026-05-07; verified on October 23, 2026.

In May 2026, Zhengzhou High-tech Zone released a policy interpretation of the modification of computing power support measures, involving actual settlement fees and related restrictions. The following are suggestions for organizing materials. Please check the original terms and values ​​on the official page.

The bill should correspond to the specific service

It is recommended to keep the service provider, account subject, billing cycle, product name and actual payment receipt, and separate the fees for different projects. The recharge balance does not necessarily equal the services that have been consumed, and the team's internal estimates cannot replace formal settlement materials.

First check the subject relationship and existing support

When consulting the competent authorities, the relationship between the service provider and the enterprise should be truthfully stated, and whether other similar funds have been applied for for the same project. Don’t obscure actual connections and duplication of support by splitting bills or adjusting project names.

Commercial quotations are still arranged based on true costs

There are specific conditions for the application, review and redemption of policy support, and it should not be regarded as determining income before confirmation. The original cost, applied status and actual arrival can be recorded separately to avoid insufficient service fees to cover operating expenses. This article does not provide a guarantee of approval or a current filing window.

Extended reading: Policy Interpretation.

Sources and editorial notes

AI assists in organizing and writing, and editors check public sources. The main text is an independent analysis by ChinaOPC, with source facts and simulation plans separated; no interviews, financial audits or actual product testing have been conducted. Official documents are based on the original text of the source and have not been adapted or replaced. English translation of the Chinese edition, prepared with machine assistance and editorial checks. Source verification dates refer to the original Chinese research. English reading guide only. The official Chinese text and the competent authority's requirements govern; this is not an official interpretation.

Source titles and publisher names are retained in their original language. Refer to the linked originals for official documents and current requirements.

← Back to Policy InsightsEditorial standards ↗